Click'Retrieve from port'and fill in the details of the other profile. 单击“Retrievefromport”并填写其他配置文件的详细信息。
In the popup, enable the "Enable Active Directory authentication" check box and fill out the desired namespace name and the host and port number of the Active Directory Controller. 在弹出窗口中,选中EnableActiveDirectoryauthentication复选框,填充ActiveDirectoryController的名称空间、主机和端口号。
The paper introduces and compares some kinds of the common foundation treatment methods on barged-in fill sand soil of port land area, and also approaches to economical and effective foundation treatment method to counter the concrete working status of the container stack yard. 对几种在港口陆域吹填砂土上常用的地基处理方法进行介绍和比较,并针对集装箱堆场的具体工况探讨经济而有效的地基处理方法。
The purpose is to fill in the gaps to complete the chain for water, electricity, traffic, commerce and tourist with the port, to offer a better condition for production and daily life. 作者根据调查资料就水电、交通、商业及旅游业与港区发展提出岚山头未来发展规划构想。
By means of analysing samples of slurry water in the construction of embankment and hydraulic fill at the Taicang Port, the mud diffusion and the evolution pattern is studied in the process of project construction. 通过对太仓港围滩吹填工程施工过程泥浆水的采样分析,研究涉及工程施工过程泥浆扩散和演变规律;
Now High fill foundation of port ground-launched compaction degree testing of traditional method have Sand filling method, nuclear measurement, ring knife method, etc, These methods are suitable for filling aggregate size is small, thickness thinner filling basis. 目前,对港口陆域高填方基础压实度检测的传统方法有灌砂法、核子测定法、环刀法等,这些方法仅适用于填筑集料粒径小,厚度较薄的填筑基础。